EasyManua.ls Logo

Suzuki Wagon R Plus RB310 - Page 644

Suzuki Wagon R Plus RB310
846 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
AUTOMATIC TRANSAXLE (M13 ENGINE) 7B1-75
Fig. for Step 3.
2 Check shift solenoid valve circuit for IG short
1) Connect valve body harness connector.
2) Disconnect TCM connectors.
3) Check for proper connection to TCM at termi-
nal E13-16 (for shift solenoid valve-A (No.1))
or E13-15 (for shift solenoid valve-B (No.2)).
4) If connection is OK, turn ignition switch ON and
measure voltage between terminal E13-16
(for shift solenoid valve-A (No.1)) or E13-15
(for shift solenoid valve-B (No.2)) of discon-
nected harness side TCM connector and
ground.
Is it 0 2 V?
Go to Step 3. DTC P0974: BRN cir-
cuit shorted to power cir-
cuit.
DTC P0977: BLK/YEL
circuit shorted to power
circuit.
3 Check shift solenoid valve resistance
1) Turn ignition switch OFF.
2) Disconnect valve body harness connector on
automatic transmission.
3) Check for proper connection to solenoid at
BRN (for shift solenoid valve-A (No.1)) or
BLK/YEL (for shift solenoid valve-B (No.2))
circuit.
Check resistance of solenoid valve. See Fig.
Resistance between shift solenoid valve-A
(No.1) terminal and transaxle: 11 15
at
20°C? (68°F)
Resistance between shift solenoid valve-B
(No.2) terminal and transaxle: 11 15
at
20°C? (68°F)
Is check results satisfactory?
Intermittent trouble or
faulty TCM. Check for
intermittent referring to
Intermittent and Poor
Connection in Sec-
tion 0A. If OK, substi-
tute a known-good
TCM and recheck.
Replace applicable shift
solenoid valve or valve
body harness.
Step Action Yes No
1. Valve body harness connector on harness
2. Valve body harness connector on transaxle
3. Shift solenoid valve-A (No.1) terminal
4. Shift solenoid valve-B (No.2) terminal
5. Ground (transaxle)
1
6
7
89
10
5
43
2
1
2
5
3
4

Table of Contents

Related product manuals