EasyManua.ls Logo

Yamaha F75F - Page 94

Yamaha F75F
344 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Electrical component and wire harness routing
5-10
1. Shift position switch
2. PTT switch
3. Water detection switch coupler
4. PTT switch coupler
5. Tilt limiter coupler (remote control model)
6. Wire harness
7. 6Y8 multifunction meter communication
coup
ler
8. Main wire harness coupler (10-pin)
9. Trolling switch coupler
10. Trim sensor coupler
11. Battery cable
12. Flushing hose
13. PTT motor lead
14. Trim sensor lead
15. PTT switch lead
16. Water detection switch lead
17. Gauge harness coupler
A. Fasten the shift position switch lead
using the
clamp.
B. Remote control model
C. Tiller handle model
D. Install the PTT switch coupler and wire
har
ness at the position shown.
E. Route the PTT switch lead under the
main wire h
arness coupler (10-pin).
F. Fold the trim sensor lead to remove any
sla
ck, and then fasten it using the clamp.
G. Install the clamp so that the end is point-
ing forward.
H. Align the tape of the battery cable with
the end of the
rigging grommet, and then
install the battery cable.
I. Route the speedometer hose so that it
does not interf
ere with the handle gear
shift.
J. Cut off the end of the clamp so that it is 1
mm (0.04 in) or less
.
K. Align the end of white tape on the PTT
lead
with the grommet end.
L. Install the grommet so that the part with-
out the groove faces the bottom side and
the stamp
ed side faces inside.
M. Stamped position
N. Install the clamp in the direction shown in
the illustr
ation.

Table of Contents