8-172 Section 8-6 - Software Reloading
8-6-2-1 Perform Software Reloading in the Service Platform (cont’d)
17.)If “Disruptive Mode Statusis disabled, Press “Yes” to enable disruptive mode.
For the remote reloading, customer has to agree to the diruptive mode. The following window
(Figure 8-237) pops up in the system screen and customer has to press “Yes” to enable Disruptive
mode.
18.)Press “System Shutdown”
NOTE: If the service dongle is inserted or the system is logged on to the maintenance mode, “System
shutdown” will not work. Please close programs and reboot the system manually.
Figure 8-237 Insite Notification
Figure 8-238 System Shutdown

Table of Contents

Other manuals for GE LOGIQ P5

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE LOGIQ P5 and is the answer not in the manual?

GE LOGIQ P5 Specifications

General IconGeneral
Power Supply100-240VAC, 50/60Hz
Display15" LCD
Doppler ModesColor Doppler, Power Doppler
Imaging ModesB-Mode, M-Mode
ProbesConvex, Linear, Phased Array
ApplicationsAbdominal, Vascular, Cardiac, OB/GYN, Small Parts, Musculoskeletal
ConnectivityDICOM, USB, Ethernet
Probe Connectors3
PortabilityMobile
Operating Temperature10°C to 40°C
Relative Humidity30%

Related product manuals