EasyManua.ls Logo

Manitowoc GROVE GMK3060

Manitowoc GROVE GMK3060
906 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Rigging work
12.1 Rigging work checklists for crane operation with the main boom
Operating manual 3 302 819 en 12 - 3
GMK3060
13.12.2018
8. Deactivate (Lock) the suspension – symbol red (suspension off);
à p. 5 - 17.
9. Support the truck crane with the outrigger span required for the job according
to the Lifting capacity table and raise until none of the wheels is touching the
ground;
à Operating the outriggers, p. 12 - 27.
10. Align the truck crane horizontally.;
à p. 12 - 43.
11. Switch off the engine;
à In the driver's cab, p. 4 - 19,
à On the outrigger control units, p. 4 - 19.
12. Earth the truck crane, if necessary;
à Earthing the truck crane, p. 12 - 13.
13. Inspect the truck crane, while looking out in particular for any leaking fluids
(oil, fuel or water).
s

Table of Contents

Related product manuals