Rigging work
12.1 Rigging work checklists for crane operation with the main boom
12 - 4 3 302 819 en Operating manual
GMK3060
13.12.2018
14. Extend the step if necessary; à p. 12 - 112.
15. Fold down the ladder in front of the crane cab;
à p. 3 - 77.
16. Start the engine for crane operation;
à p. 10 - 3.
17. Unlock the turntable and if necessary switch off the houselock;
à Unlocking the turntable, p. 11 - 19,
à Switching off the houselock, p. 11 - 22.
18. Pick up the hook block and re-reeve the hoist rope, if necessary;
à Hook block on a separate vehicle, p. 12 - 79,
à Hook block on the bumper, p. 12 - 77,
à Reeving and unreeving the hoist rope, p. 12 - 82.
19. Install the lifting limit switch;
à p. 12 - 95.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc GROVE GMK3060 and is the answer not in the manual?

Manitowoc GROVE GMK3060 Specifications

General IconGeneral
BrandManitowoc
ModelGROVE GMK3060
CategoryConstruction Equipment
LanguageEnglish

Related product manuals