EasyManua.ls Logo

Fujitsu PRIMERGY RX2530 M4

Fujitsu PRIMERGY RX2530 M4
470 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
RX2530 M4 Upgrade and Maintenance Manual 291
Processor (CPU)
11.2 Upgrading to 2 CPU configuration
V CAUTION!
CPUs are modules which are extremely sensitive to electro-static
discharges and therefore must always be handled with care. After a
CPU has been removed from its protective sleeve or from its socket,
place it with its smooth side down on a non-conducting, antistatic
surface. Never push a CPU over a surface.
Only CPUs of the same type may be used on the system board. That
means the number of the internal CPU cores as well as the primary
clock and the QPI frequency have to be the same.
For dual operation, use a suitable multiprocessor operating system.
11.2.1 Preliminary steps
Ê "Suspending BitLocker functionality" on page 77
Ê "Shutting down the server" on page 49
Ê "Disconnecting the power cord" on page 50
Ê "Getting access to the component" on page 52
Ê "Removing the air duct" on page 73
Upgrade and Repair Unit
(URU)
Hardware: 15 minutes
Software: 5 minutes
Tools: Phillips PH2 / (+) No. 2 screw driver

Table of Contents

Other manuals for Fujitsu PRIMERGY RX2530 M4

Related product manuals