GE
P
ART NUMBER FN091065, REVISION 2 VS5 N AND VS6 N SERVICE MANUAL
8-36 Section 8-3 - Control Console Components Replacement Procedures
PRELIMINARY
16.)Install the Monitor as described in the “Monitor Installation Procedure” on page 8-29.
17) Lower the console to the maximum down position.
18.)Turn ON power to the system.
19.)Proceed to perform the following functionality tests:
- “Grounding Continuity” on page 10-23
- “Chassis Current Leakage Test” on page 10-24
- “Monitor Movement Test” on page 4-36
- “Monitor Test” on page 4-22
20.)For the next stage of the Monitor Arm installation procedure, proceed to the instructions for Image
Quality Calibration, as described in Chapter 6 - Service Adjustments.