2-2-4 Time and Manpower Requirements
Site preparation takes time. Begin pre-installation checks as soon as possible to allow sufficient time to
make any required changes. If possible, begin these checks as many as six weeks before system
delivery.
Only one person is required to unpack the Vivid S5 N or Vivid S6 N ultrasound unit; at least two
people must be available to roll the system down the wheeling ramp. Attempts to move the system
considerable distances (or on an incline) by one person alone, could result in personal injury, and/
or damage to the system.