EasyManua.ls Logo

GE Vivid S5 N - 8-6-8-5 PSB Board Installation Procedure

GE Vivid S5 N
834 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE
P
ART NUMBER FN091065, REVISION 2 VS5 N AND VS6 N SERVICE MANUAL
8-152 Section 8-6 - Lower Section Components Replacement Procedures
PRELIMINARY
8-6-8 PSB (Probe Select Board) Board Replacement Procedure (cont’d)
8-6-8-5 PSB Board Installation Procedure
NOTE: When performing the following installation procedure steps, it may be helpful to review the movie clips
previously referenced in the 8-6-8-4 "PSB Board Removal Procedure" on page 8-148.
1.) Return a new PSB Board to the cabinet cage assembly and secure in the correct position by
squeezing together the two hinged latches (see Figure 8-187, above) to release the spring locking
mechanism. Release the latches and make sure the PSB Board is firmly locked in place on the cage
assembly.
2.) Re-connect the PIB-to-PSB flex cable and fasten in position using the screw previously removed -
refer to Figure 8-186 on page 8-151.
3.) Push the ECG connector up through the rectangular hole in the PSB Board (refer to
Figure 8-184 on page 8-150).
4) Fold the cage to the closed position and secure by fastening each of the two thumbscrews.
5.) Return the plastic bracket (previously removed) to the end of the connector - push into position
making sure it is fitting properly on all sides - refer to Figure 8-183 on page 8-149.
6.) Push the ECG connector down to the correct position and make sure it is properly seated (refer to
Figure 8-182).
7) Fold the cabinet cage assembly in the closed position and secure by fastening each of the two
thumbscrews.
8) Return the cabinet cage assembly to the system, reconnect the cables (previously disconnected),
close the cabinet cage door and fasten securely with the two latches.
Refer to the 8-6-1-4 "Cabinet Cage Assembly Closing and Installation Procedure" on page 8-114.
9) Return the front cover, as described in the 8-2-6-4 "Front Cover Installation Procedure" on page 8-
19.
10) Return the left and right side covers, as described in the 8-2-3-4 "Left Side Cover Installation
Procedure" on page 8-7 and 8-2-2-4 "Right Side Cover Installation Procedure" on page 8-5.
11.)Turn ON power to the system.
12.)Proceed to perform the following functionality tests:
- 10-6-4 "Grounding Continuity" on page 10-23
- 10-6-5 - Chassis Current Leakage Test
- 7-2-4-2-1 "Calibration" on page 7-12
- 7-2-4-1 "Full System Test" on page 7-11
- 4-3-1-8 "Front End Tests" on page 4-25
- 4-3-1-9 "Visual Test" on page 4-32

Table of Contents

Related product manuals