GE
P
ART NUMBER FN091065, REVISION 2 VS5 N AND VS6 N SERVICE MANUAL
8-150 Section 8-6 - Lower Section Components Replacement Procedures
PRELIMINARY
8-6-8 PSB (Probe Select Board) Board Replacement Procedure (cont’d)
c.) Push the ECG Connector all the way down through the rectangular hole in the PSB Board
(see Figure 8-184).
6.) Unfold the cabinet cage assembly (by unfastening each of the two thumbscrews), as described in
8-6-1 "Opening and Removing the Cabinet Cage Assembly" on page 8-109 (see step 11 on page 8-
112). Turn the cage assembly into the position shown in Figure 8-185
Figure 8-184 Pushing the ECG Connector Down
Figure 8-185 Cabinet Cage Assembly Open
PIB-to-PSB
Flex Cable
ECG Connector