GE
P
ART NUMBER FN091065, REVISION 2 VS5 N AND VS6 N SERVICE MANUAL
8-26 Section 8-3 - Control Console Components Replacement Procedures
PRELIMINARY
Section 8-3
Control Console Components Replacement Procedures
8-3-1 Monitor Replacement Procedure
NOTE: This section describes the procedure for replacing either a 15" or 17" monitor, as applicable
(see details below):
• Vivid S5 N systems: 15" monitor
• Vivid S6 N systems: 17" monitor
NOTE: For monitor operation and image quality calibration instructions for both the 15" and the
17" monitor, refer to the information provided in Chapter 6 - Service Adjustments.
8-3-1-1 Tools
Use the appropriate Phillips screwdriver, as indicated in the monitor replacement procedures.
8-3-1-2 Preparation
Shut down the Vivid S5 N ultrasound unit, as described in 4-2-3 "Power Shut Down" on page 4-7.
8-3-1-3 Monitor Removal Procedure
1) Working from the front of the system, lower the console to the maximum down position.
2) Make sure that the console is aligned in the central position (not pulled to one side or the other).
3) Working from the left or right of the support column, pull the locking pin slightly out to release the
monitor from the locked upright position, as shown in Figure 8-27 below.
Figure 8-27 Releasing the Monitor from the Locked Upright Position