EasyManua.ls Logo

GE Vivid S5 N - Page 689

GE Vivid S5 N
834 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE
P
ART NUMBER FN091065, REVISION 2 VS5 N AND VS6 N SERVICE MANUAL
Chapter 8 - Replacement Procedures 8-163
PRELIMINARY
8) Return and fasten the 10 screws (previously removed) to secure the RFI board in position - refer to
Figure 8-192.
9) Return the metal plate (that covers the RFI power cable) to the side of the cabinet cage assembly
and fasten securely with the 2 screws (previously removed) - refer to Figure 8-191 on page 8-156.
10.)Return the PIB Board, as described in the “PIB Board Installation Procedure” on page 8-155.
11) Fold the cabinet cage assembly in the closed position and secure by fastening each of the two
thumbscrews.
12) Return the cabinet cage assembly to the system, reconnect the cables (previously disconnected),
close the cabinet cage door and fasten securely with the two latches.
Refer to the “Cabinet Cage Assembly Closing and Installation Procedure” on page 8-114.
13) Return the system front cover, as described in the “Front Cover Installation Procedure” on page 8-19.
14) Return the system left and right side covers, as described in the “Left Side Cover Installation
Procedure” on page 8-7 and “Right Side Cover Installation Procedure” on page 8-5.
15.)Turn ON power to the ultrasound scanner.
16.)Proceed to perform the following functionality tests:
- “Grounding Continuity” on page 10-23
- “Chassis Current Leakage Test” on page 10-24
- “Calibration” on page 7-12
- “Full System Test” on page 7-11

Table of Contents

Related product manuals