EasyManua.ls Logo

Metrohm 917 - System Validation

Metrohm 917
338 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
12.4 System validation
■■■■■■■■■■■■■■■■■■■■■■
100
■■■■■■■■
917 Coulometer
12.4 System validation
Main dialog: System GLP manager System validation
In the dialog GLP manager / System validation and its subdialogs, you
can document the system validation results and define the time interval
after which validation must be carried out again.
Proceed as follows:
1
Open the properties dialog
In the System / GLP manager dialog, tap on the [System vali-
dation] button.
2
Edit data
Define the method, the result, etc. (see ""GLP manager / System
validation" dialog", page 101).
3
Define the validation interval
Tap on [Validation interval].
Enter the time interval or the date for the next system validation
(see "Dialog "System validation / Validation interval"", page 102).
Tap on the fixed key [ ].
The dialog GLP manager / System validation appears again.
4
Enter statistical data
Tap on [Test statistics].
Enter the statistical data for the last system validation (see ""Sys-
tem validation / Test statistics" dialog", page 103).
Tap on the fixed key [ ].

Table of Contents

Other manuals for Metrohm 917

Related product manuals