6. Install gate seal / liner into nozzle using 6 point socket provided. Torque
gate seal to 34-38 Nm (25-28 ft-lb) at process temperature.
15.7 Clean Nozzle Insulator Cap
1. Heat cap with heat gun.
2. Remove molten plastic and wipe remainder from insulator cap.
15.8 Installing Nozzle Insulator Cap
1. Press t insulator cap onto torpedo by hand.
Sprint Nozzle Tip Installation - continued
15-18
© 2020 Mold-Masters (2007) Limited. All Rights Reserved.
MAINTENANCE
Hot Runner User Manual