EasyManua.ls Logo

Mold-Masters Hot Runner - Main Manifolds; Inlet Seal Installation - Without Step

Mold-Masters Hot Runner
319 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5.16 Main Manifolds
Manifolds distribute melt from the inlet component to one or more
submanifolds. If you have a submanifold conguration, follow these
instructions. This system will have one of two congurations for inlet seals.
Refer to the General Assembly drawing to determine which applies.
Inlet seal without step
Inlet seal with step
5.16.1 Inlet Seal Installation - Without Step
3
2
1
4
1. Mounting screws
2. Main manifold
3. Dowel pin
4. Inlet seal
Figure 5-23 Install main manifold
Manifolds that use a seal without a step:
1. Place the inlet seal into all submanifold inlets.
2. Check that the inlet seal orientation is chamfer down.
3. Check that all inlet seal heights are at the same level.
4. Install the manifold locators. Refer to “Mounting the Manifold”.
5. Check that all components are free of debris.
1
2
1. Inlet seal
2. Submanifold
Figure 5-24 Inlet seal without step
5-34
© 2020 Mold-Masters (2007) Limited. All Rights Reserved.
ASSEMBLY
Hot Runner User Manual

Table of Contents

Other manuals for Mold-Masters Hot Runner

Related product manuals