___________________________________________________________________________________
6 - 168 Installing ETUs (Circuit Cards)
___________________________________________________________________________________
Document Revision 3 Electra Elite IPK II
8.8.2 Boot Up Sequence Status Identification
Status of the IAD(8)-U( ) ETU during boot up is shown in Table 6-63
IAD(8)-U( ) ETU LED Boot Sequence Indications.
8.8.3 Installation
This ETU can be installed in any KSU slot that supports the
applicable ETU simulated.
Basic Port Package
A maximum of three IAD(8)-U( ) ETUs can be installed in slots
S1~S8 when used as an ESI.
A maximum of six IAD(8)-U( ) ETUs can be installed in slots S1~S8
when used as a CCISoIP ETU.
Expanded Port Package
A maximum of 14 IAD(8)-U( ) ETUs can be installed in slots S1~S8
when used as an ESI.
Table 6-62 IAD(8)-U( ) Configurations
Configuration
Port
s
Installation slot
Electra Elite IPK
II
Application
CCISoIP 8 S1~S8 CCISoIP ETU
ESI(8)-U( ) 8 S1~S8 Megaco Station ETU
Table 6-63 IAD(8)-U( ) ETU LED Boot Sequence Indications
State
D8
CH
1
D6
CH
2
D4
CH
3
D2
CH
4
D7
CH
5
D5
CH
6
D3
CH
7
D1
CH
8
*D12
LIVE
Approximate
Time
1 O f f O ff O f f O ff O ff O f f O ff O ff F l as h 1 s ec o nd
(from Cold Boot)
2 ON ON ON ON Off Off Off Off Flash 5 seconds
3 Off Off Off Off Off Off Off Off Flash 3 seconds
4 Off Off Off Off ON ON Off Off Flash 5 seconds
5 Off Off Off Off Off Off ON ON Flash 5 seconds
6 Off Off Off Off Off Off Off Off Flash 5 seconds
* LIVE LED D12 also flashes when ETU is receiving power from the KSU.