EasyManua.ls Logo

NEC ELECTRA ELITE IPK II - Chapter 5; General Information; Precautionary Information; Site Preparation and MDF;IDF Construction

NEC ELECTRA ELITE IPK II
642 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
System Hardware Manual 5 - 1
___________________________________________________________________________________
___________________________________________________________________________________
Installing KSUs Chapter 5
SECTION 1GENERAL INFORMATION
This chapter contains information to help the technician install the KSUs for the
Electra Elite IPK II system. The technician should be familiar with this section before
installing any equipment.
SECTION 2SITE PREPARATION AND MDF/IDF CONSTRUCTION
Preinstallation planning is essential. Advanced planning minimizes installation time,
cost, and disruption of the customer business activities.
2.1 Precautionary Information
1. Never install telephone wiring during a lightning storm.
2. Never install telephone jacks in wet locations unless the jack is
specifically designed for wet locations.
3. Never touch uninsulated telephone wires or terminals unless the
telephone line is disconnected at the network interface.
4. Use caution when installing or modifying telephone lines.
2.2 Surveying the Customer Site
In most cases, a survey of the customer site is necessary to determine the
proper placement of the Main Distribution Frame (MDF), the exact dimensions
of the area selected for the MDF, cabling requirements, and possible
Intermediate Distribution Frame (IDF) locations.
Observe the following warnings during installation.

Table of Contents

Other manuals for NEC ELECTRA ELITE IPK II

Related product manuals