___________________________________________________________________________________
5 - 6 Installing KSUs
___________________________________________________________________________________
Document Revision 3 Electra Elite IPK II
Third ETU
42 YL–OR GN T T T T T T T GND TA TA-1
17 OR–YL RD R R R R R R R — TB TB-1
43 YL–GN GN T T T T T T T E-1 RA RA-1
18 GN–YL RD R R R R R R R M-1 RB RB-1
44 YL–BR GN T T T — T T T T-1 — TA-2
19 BR–YL RD R R R — R R R R-1 — TB-2
45 YL–SL GN T T T — T T T T1-1 — RA-2
20 SL–YL RD R R R — R R R R1-1 — RB-2
46 VI–BL GN T T — — T — — GND — TA-3
21 BL–VI RD R R — — R — — — — TB-3
47 VI–OR GN T T — — T — — E-2 — RA-3
22 OR–VI RD R R — — R — — M-2 — RB-3
48 VI–GN GN T T — — T — — T-2 — TA-4
23 GN–VI RD R R — — R — — R-2 — TB-4
49 VI–BR GN T T — — T
Fax
Branch
—T1-2— RA-4
24 BR–VI RD R R — — R — R1-2 — RB-4
50 — — — — — — — — — — — —
25 — — — — — — — — — — — —
PFT circuits are only connected to AMP3.
AMP1 is connected to S1, S2, and S3.
AMP2 is connected to S4, S5, and S6.
AMP3 is connected to S7 and S8.
Table 5-1 MDF Cable Connections (Continued)
MDF
Pin
N0.
Running
Cable
Station
Cable
DTH
ESI
SLI
(8)
SLI
(4)
OPX
COI/
COIB/
(8)
COI/
COIB/
(4)
DID TLI
DTI/
PRT
BRT