EasyManua.ls Logo

Omron RX Series - Page 440

Omron RX Series
688 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7 Detailed Functions
7 - 114
High-function General-purpose Inverter 3G3RX-V1 User’s Manual (I578-E1)
Connection and timing diagrams for commercial switching operation
Make sure that MC3 and MC2 are mechanically interlocked. Not doing so may result in damage to
the inverter.
If the earth leakage breaker (ELB) trips due to a ground fault, the commercial power supply circuit
does not work as well. If necessary, provide a backup power supply circuit separate from the
commercial circuit.
If an overcurrent trip occurs during frequency matching, increase the Restart Standby Time (b003).
For commercial switching operation, refer to the above Connection and timing diagrams for
commercial switching operation.
For FWY, RVY, and CSY, use low-voltage relays. Use the above timing sequence diagrams for
reference.
The inverter can be set up to restart automatically at power-on. In this case, the terminal CS is not
required. For details, refer to Reset (RS) on page 7-115.
MCCB
ELBC
MC2
MC1
R
S
T
Ro
To
FS
FV
FC
FW
RV
CS
SC
FWY
RVY
CSY
MA
MB
MC
U
V
W
MC3
THRY
Motor
MC1
MC2
MC3
FW
CS
MC1
MC2
MC3
FW
CS
ON
ON
ON
ON
ON
Operation
Inverter
output
frequency
Interlock time of MC2 and MC3
(0.5 to 1 s)
ON
ON
ON OFF
0.5 to 1 s
Retry wait time b003
Operation
Operates after frequency matching.
Inverter-to-Commercial
switching operation timing diagram
Commercial-to-Inverter
switching operation timing diagram

Table of Contents

Related product manuals