11 - 5
11 Maintenance and Inspection
High-function General-purpose Inverter 3G3RX-V1 User's Manual (SBCE-367)
11-1 Inspection
11
11-1-3 Inspection Items
11-1-3 Inspection Items
Inspection
category
Inspection
item
Inspection
point
Inspection
frequency
Inspection method Criteria Meter
Daily
Periodic
1
year
2
years
General
Ambient
environment
Check ambient
temperature,
humidity, and
dust.
Refer to 2-1 Installation
on page 2-4.
Ambient
temperature:
–10 to 50°C,
no freezing
Operating
humidity:
90% max.,
no condensation
Thermometer,
hygrometer,
recorder
Entire
system
Check for
abnormal
vibration and
sound.
Perform visual and
acoustic inspection.
No faults
Power
supply
voltage
Check main
circuit voltage.
Measure line voltage
between Inverter main
circuit terminals R/L1,
S/L2, and T/L3.
Within allowable
AC voltage
fluctuation range
Test er,
digital
multimeter
Main
circuit
General
Perform megger
check
(between main
circuit terminals
and ground
terminal).
Disconnect I/O wires
from the inverter main
circuit terminal block
and remove the control
terminal block PCB.
Then, after removing
the short-circuit bar for
switching the inverter
built-in filter function,
measure using a
megger the resistance
between the ground
terminal and the
short-circuited terminals
R/L1, S/L2, T/L3, U/T1,
V/T2, W/T3, P/+2, +1,
N/–, and RB.
5 MΩ min.
500-VDC
class
megger
Check for loose
bolts and
screws.
Retighten loose bolts
and screws.
No faults
Check each part
for traces of
overheating.
Perform visual
inspection.
No faults