Chapter 5 Maintaining Your Library
Maintenance Actions
Scalar i2000 User’s Guide 304
Running the Verification Tests 5
This section provides instructions for starting the installation verification
test, partial tests, and FRU operational tests.
To stop a test, disable the robotics by pressing the Robotics Enable button
on the operator panel or by clicking Stop on the Verification Tests dialog
box. Control will be returned to you as soon as the current command is
completed.
The test results appear after the tests complete. The different reports
(Library Report, Drive Report, and Blade Report) will be generated and
viewable in the Reports area of the Verification Tests dialog box.
If a typical user logs on while an administrator is logged on and running
a verification test, testing will continue unaffected. Only one administrator
can be logged on at any given time.
Installation Verification Test 5When the installation verification test is
running, no one else can log on to the library. The message, "Verification
Test is Running," is displayed in the Activity area of the main LMC
display.
1 Log on as an administrator.
2 Make sure that you are viewing the physical library. From the View
menu, click the name of the physical library.
3 Click Tools→ Verification Tests.