30.1 General
General rule
It is assumed that the 'Site' was commissioned in accordance with the existing
directives, i.e., all functions have been tested and the 'Site' data has been saved
and archived.
Protocol
Measurement values must be recorded according to specifications.
Recorded measurement values must be stored in the site file.
NOTICE
Non
-
observance of rules during maintenance work
Insufficient maintenance and damage to the 'Site' or parts thereof
Always de-energize the 'Station' first before connecting, fitting, or removing
components.
Prevent electrostatic discharge.
If undertaking work on components, you must use an EMC mat.
Do not touch the modules unnecessarily with your bare hands.
Do not unnecessarily switch off the 'Site' or parts thereof for long periods of
time.
30.2 Testing
FS20 offers various test functions for efficient testing of devices and logical
functions. Some test methods can be combined, others have to be carried out
individually.
The fire detection installation is in 'Test' operation mode if one of the following test
modes is activated:
'Detector test'
'Walk test'
'Control test'
'Installation test'
Test variants
You will find more information on testing the system in document
008838