Adding a 'Station' to an existing 'Site'
12
46 | 188
12 Adding a 'Station' to an existing 'Site'
Prerequisites
● The ↑ detector lines and FDnet devices are installed.
● The acceptance test has been carried out for the detector lines.
● The ↑ 'Station' is installed, but the batteries are not connected yet.
● The cables for the detector lines and the mains supply have been inserted in
the 'Station', but not yet connected.
● SintesoWorks is installed on the PC.
● The current firmware and ↑ BDV are available on the PC.
You will find additional information about the individual steps on the specified
pages.
Commissioning
1. In SintesoWorks, create the ↑ 'Station' to be integrated and configure it, if
required.
2. Prepare the 'Station' for commissioning - without BDV installation. Link [➙ 77]
3. Connect the PC to the 'Station'. Link [➙ 27]
4. Initialize the 'Station'. Link [➙ 28]
5. Read-in the FDnet devices. Link [➙ 85]
6. Load the configuration from the 'Station' to the PC. Link [➙ 32]
7. Adapt the configuration in SintesoWorks. Link [➙ 80]
8. Load the configuration from the PC to the 'Station'. Link [➙ 30]
9. Test the function of the ↑ 'Site'. Link [➙ 91]
10. Remedy any errors you notice and load the corrected configuration from the
PC to the 'Station'. Link [➙ 30]
11. Disconnect the PC from the 'Station'. Link [➙ 27]
12. Perform the completion tasks. Link [➙ 91]