Mounting / Installation
Installing and checking the detector line
3
22 | 188
Building Technologies
009052_s_en_
--
Fire Safety
2016
-
-
02
3 Mounting / Installation
3.1 Installing and checking the detector line
You will find details on the technical term
'
FDnet
' in the chapter
'Glossary'.
Most FDnet devices are installed on a base and can be changed with ease.
The bases of non-stationary FDnet devices and stationary FDnet devices must be
installed and uninstalled when the FDnet detector line is switched off and
disconnected from the power supply.
Prerequisites
The FDnet detector line is not connected to the control panel and is
disconnected from the power supply when the FDnet devices are being
installed, wired and inserted.
The FDnet detector line is tested with the line tester FDUL221.
The control panel is commissioned by the commissioning personnel.
3.1.1 Installing devices with serial number
Before inserting or connecting an
FDnet
device, stick the
serial number
on the
layout plan. The adhesive strip with the serial number can be found on the bottom
of the device.
1. Mount and wire the FDnet devices and stick the serial number for each device
on the layout plan.
2. Install the detector dust caps on the optical point detector if necessary.
3. Install the designation plate if necessary.
3.1.2 Installing devices according to the wiring sequence
1. Mount and wire the FDnet devices and document the wiring sequence in the
layout plan.
2. Install the detector dust caps on the optical point detector if necessary.
3. Install the designation plate if necessary.