30
161 |
Building Technologies
Change in use
Verify whether a change of use or changes to the building have an effect on the
configuration and perform the necessary corrections.
Pending modification applications
Check that all pending modification applications such as corrections to the
diagrams or modifications to the fire brigade orientation plans have been
completed.
30.6 Testing the 'Station'
Check the hardware
● Check the condition of the housing and the components.
● Check the fixture of screws, terminals and plug connections.
● Check that the batteries are not leaking (inspection).
Check labeling
Check that the inscription strips are correct and still easily legible.
Check the function
1. Enter the password.
2. Initiate the lamp test.
3. Check switchover of operation modes from 'Manned operation' to 'Unmanned
operation' and vice versa.
4. Switch an 'Area' off and on again.
5. Check the operation of an alarm.
6. Check the operation of a 'Fault'.
7. Block operation.
Clean the operating unit
Clean the display and the front plate with a wet cloth. Do not use any caustic
solvents.