EasyManua.ls Logo

ABB REG670 - Mounting Procedure for Side-By-Side Flush Mounting

ABB REG670
1298 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Use only the screws included in the mounting kit when mounting the
plates and the angles on the IED. Screws with wrong dimension may
damage the PCBs inside the IED.
Please contact factory for special add on plates for mounting FT
switches on the side (for 1/2 19" case) or bottom of the relay.
21.4.5.2 Mounting procedure for side-by-side flush mounting
1
2
3
4
IEC06000181-2-en.vsd
IEC06000181 V2 EN
Figure 562: Side-by-side flush mounting details (RHGS6 side-by-side with 1/2 x
19” IED).
The required torque for the screws is 3.5 Nm.
PosNo Description Quantity Type
1 Mounting plate 2 -
2, 3 Screw, washer 16 M4x6
4 Mounting angle 2 -
Section 21 1MRK502052-UEN B
IED hardware
1214
Technical manual

Table of Contents

Other manuals for ABB REG670

Related product manuals