Test Directions SetupTest Directions Setup
CIRCIR
Test SequenceTest Sequence
The required setup to perform RFC 6349 test is transferred from the 'local'
Network Master to 'remote' Network Master when the test is started.
Touch the fields to set the Site Names :
LocalLocal: The site name for 'local' Network Master side.
RemoteRemote: The site name for 'remote' Network Master side.
Select the one or more check boxes. Ethernet frames are sent from left side site
name to right side site name. Ethernet frames received at the site displayed
right side will be measured.
Selecting Simultaneous in Both DirectionsSimultaneous in Both Directions tests the both throughput of
outgoing and incoming streams.
Communication PortCommunication Port
Touch the fields to set the port number.
Touch the fields to set the committed information rate (CIR).
Upstream CIRUpstream CIR: CIR of outgoing stream.
Downstream CIRDownstream CIR: CIR of incoming stream.
Select the check boxes of the test defined in RFC 6349, which you wish to run.
Path MTUPath MTU
Runs a test to determine the Path MTU (Maximum Transmission Unit). If
cleared, set the Upstream MTUUpstream MTU and Downstream MTUDownstream MTU.
Baseline RTTBaseline RTT
Runs a test to determine the Baseline RTT. If cleared, set the Baseline RTT
value in the field.
Window Scan and ThroughputWindow Scan and Throughput
Runs a test to determine Throughput test while scanning the TCP window size.
Test ModeTest Mode
Auto: Scans at the window size of 25%, 50%, 75%, and 100% of BDP.
Expert: Scans the window size defined by user.
Multi-ServiceMulti-Service
Runs a test to measure the throughput with multiple TCP connections.
66..1010..22..22 MTU / RTTMTU / RTT
MTU / RTTMTU / RTT button in the navigation area is enabled if Path MTU check box or
Baseline RTT check box is selected on "Control" screen.