EasyManuals Logo

Dräger Apollo Operating Instructions

Dräger Apollo
232 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #62 background imageLoading...
Page #62 background image
Chapter 4 - System Setup Connecting AC Power
54 Apollo Operator’s Manual
Part Number: 90 38 237, 6th edition
If a circuit breaker is tripped (position 0):
1. Remedy the fault.
2. Press the switch on the circuit breaker into
position 1.
In cases of a blown safety fuse:
1. Remedy the fault.
2. Have the safety fuse replaced by an electrician.
Connecting the Apollo to Mains Power
Figure 36. Location of AC Power LEDThe mains voltage must correspond to that specified
on the rating plate on the back of the machine.
Plug the mains power plug of the Apollo
workstation into the mains outlet. The green
LED labeled >
N AC Power< lights up (1 in
Figure 36).
Note: The main circuit breaker for the machine is
located on the back of the machine below
the pipeline connections and behind the
cylinder mounts (2 in Figure 34).
1

Table of Contents

Other manuals for Dräger Apollo

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Dräger Apollo and is the answer not in the manual?

Dräger Apollo Specifications

General IconGeneral
BrandDräger
ModelApollo
CategoryMedical Equipment
LanguageEnglish

Related product manuals