D-6 F650 Digital Bay Controller GE Multilin
D.1 IEC 60870-5-104 PROTOCOL APPENDIX D
D
b) OPERATIONS IN IEC 60870-5-104 FOR F650
There are 24 available operation in F650 device, they must be configured using EnerVista 650 Setup in the
menu ā
Setting > Relay Configuration > Operationsā.
ASDU address must start with 3000, the addresses for operation are from 3000 to 3011. The operations go
from 0 to 23. Subtracting 3000 we obtain a number between 0 and 11, this number is multiplied by two, and
plus 1 if the operation is ON.
The date in the answer is the same as the received in the command.
The following ASDUS are answered to:
<45> Single command C_SC_NA_1
<46>Double command C_DC_NA_1
<58> Single command with time tag CP56Time2a C_SC_TA_1
<59>Double command with time tag CP56Time2a C_DC_TA_1
GROUP 5 METERING GROUP 6 METERING
POINT DESCRIPTION POINT DESCRIPTION
M_ ME_NC_1 Points M_ ME_NC_1 Points
2000 Phasor Ia Primary 2027 Phase A Apparent Pwr
2001 Phasor Ib Primary 2028 Phase A Real Pwr
2002 Phasor Ic Primary 2029 Phase B Reactive Pwr
2003 Phasor Ig Primary 2030 Phase B Apparent Pwr
2004 Phasor Isg Primary 2031 Phase B Real Pwr
2005 Phasor In Primary 2032 Phase C Reactive Pwr
2006 RMS Ia Primary 2033 Phase C Apparent Pwr
2007 RMS Ib Primary 2034 Phase C Real Pwr
2008 RMS Ic Primary 2035 3 Phase Reactive Pwr
2009 RMS Ig Primary 2036 3 Phase Apparent Pwr
2010 RMS Isg Primary 2037 3 Phase Real Pwr
2011 I0 Primary 2038 Phase A Power Factor
2012 I1 Primary 2039 Phase B Power Factor
2013 I2 Primary 2040 Phase C Power Factor
2014 V0 Primary 2041 3 Phase Power Factor
2015 V1 Primary 2042 Line Frequency Primary
2016 V2 Primary 2043 Bus Frequency Primary
2017 Vab Primary 2044 Vx Primary
2018 Vbc Primary 2045 Positive MVarhour
2019 Vca Primary 2046 Negative MVarhour
2020 Vn Primary 2047 Positive MWatthour
2021 Va Primary 2048 Negative MWatthour
2022 Vb Primary
2023 Vc Primary
2024 VL Primary
2025 VBB Primary
2026 Phase A Reactive Pwr