GE
P
ART NUMBER FN091065, REVISION 2 VS5 N AND VS6 N SERVICE MANUAL
7-92 Section 7-5 - Monitoring Tests
PRELIMINARY
7-5-1 Accessing the Monitoring Diagnostic Test Options (cont’d)
9.) Check that the sub-test passed and that result values are within the pre-defined Max and Min limits,
as shown in Figure 7-60 "View Test Log - Full System Monitoring Test - Fixed Voltages" on page 7-
92.
10.)Select the second report (Temperatures); the report is highlighted in the Reports list, and the
corresponding results are shown in the Report window below, as shown in Figure 7-61 "View Test
Log - Full System Monitoring Test - Temperatures" on page 7-93.
Figure 7-60 View Test Log - Full System Monitoring Test - Fixed Voltages