Chapter 5 Maintaining Your Library
Maintenance Actions
Scalar i2000 User’s Guide 276
• Full system tests or individual field replaceable unit (FRU) tests
• Logs of installation and configuration tests
• Graphical reports showing passed, marginal, and failed results
• No affect to integrity of data
To perform these tests, the accessor assembly must be ready and
functional, and the library must be powered on. In addition, the library
must be in an offline state, and at least one scratch tape must be inserted
in the I/E station.