EasyManua.ls Logo

Siemens 7SJ85 - Page 1196

Siemens 7SJ85
1638 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
The voltage can be controlled at the voltage measuring point or at the load point in the electrical power
system. In this case, the load-point voltage is calculated on the basis of the measured load current and the
known impedance between the voltage measuring point and the load point.
The following figures show possible configurations of the voltage controller for two-winding transformers
with and without current measurement.
[dwkonlst-060913.vsd, 1, en_US]
Figure 8-98
Voltage-Controller Constellation for Two-Winding Transformers with Current Measurement for
Load Compensation at the End of the Line
(1) Only if a transformer side is present
Control Functions
8.9 Voltage Controller
1196 SIPROTEC 5, Overcurrent Protection, Manual
C53000-G5040-C017-8, Edition 07.2017

Table of Contents

Related product manuals