EasyManua.ls Logo

Siemens 7SJ85 - Page 489

Siemens 7SJ85
1638 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
[loinru05-240211-01.tif, 1, en_US]
Figure 6-84 Logic of the CWA-Method Function (T = 1 Period)
Logic of the Inrush-Current Detection
The following logic diagram shows the link of the 2 methods of measurement Harmonic Analysis and CWA
method.
The crossblock function influences the Harmonic Analysis process. If you have set the parameter Cross-
blocking to yes, you will receive in the event of threshold-value violation a blocking indication for all 3
phase currents and the measured or calculated zero-sequence current (l
2nd harm
/ l
1st harm
). The crossblock func-
tion works via a timer. Set parameters for the time depending on the expected duration factor via the param-
eter Crossblocking time.
If the phase current exceeds the maximum permissible current Operat.-range limit Imax, the inrush-
current detection will be blocked.
Protection and Automation Functions
6.8 Inrush-Current Detection
SIPROTEC 5, Overcurrent Protection, Manual 489
C53000-G5040-C017-8, Edition 07.2017

Table of Contents

Related product manuals