4 | 188
7 B1 - Commissioning standalone 'Station' with PC,
without pre-configuration ......................................................................41
8 B2 - Commissioning standalone 'Station' with PC, with pre-configuration ...42
9 C- Commissioning networked 'Stations' .................................................43
10 Commissioning FC2080 .......................................................................44
11 Commissioning FG2020.......................................................................45
12 Adding a 'Station' to an existing 'Site' .....................................................46
13 Merging two 'Sites' ..............................................................................47
13.1 Adding 'Site' B to 'Site' A ............................................................................ 48
13.2 Connecting 'Sites' physically to one another ............................................... 48
14 Changing and expanding the FDnet/C-NET detector line .........................49
14.1 Extending the detector line to include additional devices ............................ 49
14.1.1 Mount and wire new devices ....................................................... 49
14.1.2 Configure a new device ............................................................... 50
14.2 Replacing stationary devices of the same type ........................................... 50
14.3 Permanently removing stationary devices .................................................. 51
14.4 Removing or replacing non-stationary devices ........................................... 51
14.4.1 Temporarily removing an individual non-stationary device ........... 51
14.4.2 Temporarily removing multiple non-stationary devices ................. 52
14.4.3 Permanently removing non-stationary devices ............................ 52
14.4.4 Replacing non-stationary devices of the same type ..................... 53
14.4.5 Replacing non-stationary devices of different types ..................... 53
14.5 Replacing 'Manual call point' of the same type ........................................... 54
14.5.1 Switching on the replace mode ................................................... 55
14.5.2 Switching off replace mode ......................................................... 55
14.5.3 Testing 'Manual call point' ........................................................... 55
14.6 Convert two stubs into a loop ..................................................................... 56
14.7 Connecting a sub-stub to a loop ................................................................. 56
15 Commissioning the control panel with MS9i detector lines ........................57
16 Commissioning control panel with collective detector lines .......................58
16.1 Pre-configuration ....................................................................................... 58
16.2 Reference measurement with EOL 4k7 and 3k3 ........................................ 59
16.3 Possible error messages ........................................................................... 59
16.3.1 'Line Fault' error message ........................................................... 60
16.4 Troubleshooting procedure ........................................................................ 60
16.4.1 Checking the collective detector line ........................................... 60
16.4.2 Checking line resistance ............................................................. 61
16.4.3 Checking the line continuity ......................................................... 61
16.4.4 Measuring insulation values ........................................................ 62
16.4.5 Commissioning the collective detector line step-by-step .............. 63