System Functions 77
1
Set The Number Of Days Until The First Test Report
If you require the first test to report (Contact ID Event Code 602) the day after you are
installing the control panel and you have programmed the repeat interval between each test
report for every 7 days, you will need to set when the first test report will occur. If the first test
report is not set using this Installer Code Function, the first test report will be sent to the base
station receiver in the number of days programmed in the repeat interval. Refer to
"LOCATION 360 - 366" on page 187 for setting the test report time and repeat interval.
How To Set The First Test Report
1.
Enter your
followed by
1
and the button.
Three beeps will be heard and the
STAY
and
AWAY
indicators will begin to flash.
2.
Enter the to wait (1 - 15 days) until the first test report is required.
3.
Press the
button when finished.
Two beeps will be heard and the
STAY
and
AWAY
indicators will extinguish. The
system will now return to the disarmed state.
+
1
+
+
+
Each time you enter Installer's Programming Mode after you have set when the first test
report will occur, the first test report time will default back to the repeat interval time
between each test report as set in “LOCATION 366”.
Test reports will not report if the Subscriber ID Number is 0000. The number of days
decrements by one at 2400 hours as set in "LOCATION 901 – 904" on page 210.
Example
If you programmed the repeat interval in the test reports for every seven days, but wish to have
the first test report to begin in two days time, follow the sequence outlined below;
1234
+
1
+
+
2
+
Electronics Design and Manufacturing Pty Limited ISSUE130