8-50 Section 8-3 - Control Console Components Replacement Procedures
PRELIMINARY
8.) Attach the Up-Down Lever to the cable holder lever and fasten it with the retaining screw (see
Figure 8-64).
9.) Adjust the tension of the Up-Down Cables, as described in “Adjusting the Tension of the Up-Down
Cables” on page 8-51, then proceed to step 10.
10.)Return the Probe shelf as described in the “Probe Shelf Installation Procedure” on page 8-52.
11.)Return the Keyboard Assembly as described in the “Keyboard Assembly Installation Procedure” on
page 8-42.
12) Lower the console to the maximum down position.
13.)Turn ON power to the system.
14.)Check for proper up/down and side-to-side movement of the operator panel and monitor, as
described in “Mechanical Functional Tests” on page 4-35.
15.)Proceed to perform the following functionality tests:
- “Grounding Continuity” on page 10-23
- “Chassis Current Leakage Test” on page 10-24
Figure 8-64 Up-Down Lever Connected to Cable Holder Lever