EasyManua.ls Logo

GE Vivid S60N - AC Distribution Box Installation Procedure

GE Vivid S60N
478 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
D
IRECTION FR091521, REVISION 1 VIVID S60N/VIVID S70N BASIC SERVICE MANUAL
Chapter 8 - Replacement Procedures 8-141
PRELIMINARY
6.) Slide the AC Box all the way out until it is completely removed from the system as shown in Figure
8-171 below.
8-5-21-5 AC Distribution Box Installation Procedure
1.) Place a new AC Distribution Box in its position on the system.
2.) Install the new AC Distribution box by performing the removal procedure steps, in reverse order.
3.) Install the Battery, then refit the AC Distribution Box cover:
4.) Turn ON power to the system.
Figure 8-171 Removing the AC Distribution Box
Battery Installation Procedure on page 8 - 146
AC Distribution Box Cover Installation Procedure on page 8 - 30

Table of Contents

Other manuals for GE Vivid S60N

Related product manuals