EasyManua.ls Logo

GE Vivid S60N - BIF Connection Map Label Replacement Procedure; Tools; Time Required; Preparation

GE Vivid S60N
478 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
D
IRECTION FR091521, REVISION 1 VIVID S60N/VIVID S70N BASIC SERVICE MANUAL
8-138 Section 8-5 - Electronic Cage Components - Replacement Procedures
PRELIMINARY
8-5-20 BIF Connection Map Label Replacement Procedure
Note: The BIF Connection Map label, is orderable as a separate part.
8-5-20-1 Tools
No special requirements.
8-5-20-2 Time Required
5 min
8-5-20-3 Preparation
Shut down the Vivid™ S60/Vivid™ S70 ultrasound unit, as described in Power Shut Down on page 4 - 7.
8-5-20-4 BIF Connection Map Label Removal Procedure
The label is located on the sub-woofer -see Figure 8-166.
1.) Using a blunt non-metallic instrument, carefully peel off the existing label.
2.) Clean and prepare the sub-woofer’s surface for adhering the replacement label.
8-5-20-5 BIF Connection Map Label Installation Procedure
1.) Remove the self-adhesive replacement label from its packing
2.) Carefully adhere the label to the sub-woofer’s surface making sure that it is position straight and
parallel to the inlaid impression on the sub-woofer.
FRU Part #
Refer to Table 9-14 on page 9-13.
Figure 8-166 Sub-Woofer Showing Location of BIF Connection Map Label

Table of Contents

Other manuals for GE Vivid S60N

Related product manuals