APPENDIX 32
────────────────────────────────────────────────────
Appendix 8 Printout Samples
────────────────────────────────────────────────────
Date and time of printou
Date and time of start of deman
measurement
Demand count
* This example shows the data for th
second demand measurement.
Integrated power
* These are the integrated values,
during the set demand period sinc
the start of integration.
Average value within a time period
* These are the average values durin
the demand period, derived from the
integrated power indicated above.
Output at the next (third) demand perio
* The setting of each item is the same
as for the previous time.
(3) Demand Measurement mode
Demand measurement (Integrated power and average value within a time
period)