18
────────────────────────────────────────────────────
3.1 Flow Chart of Basic Operating Procedure
────────────────────────────────────────────────────
Connect voltage cords to the power mete
Connect clamp on sensors to the power mete
Connect power cord to the power mete
Turn on powe
Confirm results of self-check
.1 Flow Chart of Basic Operating Procedure
A flow chart of the basic operating procedure for this power meter is shown
below.