EasyManua.ls Logo

Hioki 3166 - Flow Chart of Basic Operating Procedure

Hioki 3166
380 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
92
────────────────────────────────────────────────────
7.2 Flow Chart of Basic Operating Procedure
────────────────────────────────────────────────────
Select "Demand Measurement" from the initial scree
n
Check for incorrect wiring and confirm that there are n
o
wiring errors
Return to the "Instantaneous Value" scree
n
Check the setting
s
Make special settings needed for integrated measuremen
t,
such as integration start/stop and the integration time
(Refer to section 4.4,
"Wiring Settings and Methods."
)
(Refer to section 4.5,
"Checking for Incorrect Wiring."
)
Wire the power meter to the line being measure
d
Return to the "Instantaneous Value" scree
n
Press the START/STOP key to start integrated
measurement
7
.2 Flow Chart of Basic Operating Procedure
The basic operating methods are the same as for "Integrated Measurement"
mode.

Table of Contents