45
────────────────────────────────────────────────────
5.2 Flow Chart of Basic Operating Procedure
────────────────────────────────────────────────────
1
2
3
4
5
6
7
8
9
10
11
12
13
14
A
Select "Normal Measurement" from the initial scree
Check for incorrect wiring and confirm that there are n
wiring errors
Return to the "Measurement" scree
Check the setting
Measur
(Refer to section 4.4,
"Wiring Settings and Methods."
(Refer to section 4.5,
"Checking for Incorrect Wiring."
Wire the power meter to the line being measure
.2 Flow Chart of Basic Operating Procedure