65
────────────────────────────────────────────────────
6.2 Flow Chart of Basic Operating Procedure
────────────────────────────────────────────────────
1
2
3
4
5
6
7
8
9
10
11
12
13
14
A
Select "Integrated Measurement" from the initial scree
Check for incorrect wiring and confirm that there are n
wiring errors
Return to the "Instantaneous Value" scree
Check the setting
Make special settings needed for integrated measuremen
such as integration start/stop and the integration time
(Refer to section 4.4,
"Wiring Settings and Methods."
(Refer to section 4.5,
"Checking for Incorrect Wiring."
Wire the power meter to the line being measure
Return to the "Instantaneous Value" scree
Press the START/STOP key to start integrated
measurement
.2 Flow Chart of Basic Operating Procedure