EasyManuals Logo

IAI Rcon User Manual

IAI Rcon
838 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #249 background imageLoading...
Page #249 background image
3.8 I/O Signals
A3-146
ME0384-4A
Chapter 3 Gateway Unit
Specifications Section
The basic time chart is as follows.
Caution
The pressing operation speed is 20 mm/s.
Refer to an instruction manual of each ELECYLINDER or a catalog for detail.
The workpiece remains pressed after the pressing is completed.
If the workpiece moves or pushes back, it may be pressed even further.
Hitting a workpiece during the approaching operation will cause "Alarm Group A:
Overload Alarm".
ST signal
PE signal
ELECYLINDER
movement
PE signal ON
→ ST signal OFF
Pressing
operation
Approach operation
Not ON
at failure to contact
Pressing complete

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IAI Rcon and is the answer not in the manual?

IAI Rcon Specifications

General IconGeneral
BrandIAI
ModelRcon
CategoryController
LanguageEnglish

Related product manuals