EasyManua.ls Logo

ICON A5 - Page 528

ICON A5
836 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
14-20 LANDING GEAR / LANDING GEAR GENERAL MAINTENANCE
ICON A5 / MAINTENANCE MANUAL CHANGE C2
CHAPTER 14
7. Repeat steps 3 thru 6 as needed until the landing gear is properly adjusted.
8. Replace the interior panels, extend the landing gear, and lower the aircraft off the jacks. (See
“Right Instrument Panel Top Panel Installation” on page 8-18.)(See “Removal and Installation of
Inspection Panels and Fairings” on page 3-34.)
VERIFICATION METHOD:
Power up the aircraft, and actuate the landing gear to verify adjustment.
RELATED INFORMATION:
"Right Instrument Panel Top Panel Removal" on page 8-17
"Right Instrument Panel Top Panel Installation" on page 8-18
"Removal and Installation of Inspection Panels and Fairings" on page 3-34

Table of Contents

Other manuals for ICON A5