EasyManua.ls Logo

Mazda Mazda6 - Page 628

Mazda Mazda6
909 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
L–12
PROPELLER SHAFT
Locknut Assembly Note
1. Align the mark on the center yoke and shaft, and
install the center yoke.
Tightening torque
137—177 N·m
{16.1—18.0 kgf·m, 116—130 ft·lbf}
Bearing Cup and Snap Ring Assembly Note
1. Apply the grease to the bearing rollers inside the
bearing cups.
2. Set the new spider to the yoke, and assemble the
new bearing cup as the snap ring groove comes
out.
3. Assemble the opposite bearing cup in the same.
4. Insert the bearing cup to the yoke as the snap
ring groove width of bearing cup widens most and
both grooves width are same.
Caution
• Use a snap ring that thickness is same
for both sides.
MARK
A6E6110W005
GREASE
GREASE
GREASE
GREASE
A6J6110W016
A6E6110W010
BEARING CUP
SPIDER
YOKE
A6E6110W011

Table of Contents