28 Oct
1997 21:57
CELL-DYN
®
3/35 Sample Loader TS Guide 9140234B-June 1997
VERIFICATION PROCEDURES 3 - 1
3
Search
Book TOC
Go Back
Chapter 3 Table of Contents
3.1 OVERVIEW
3.2 INTERRELATIONSHIP MATRIX
3.3 VERIFICATION PROCEDURES
VP - 1 Power Supply Check [NON-CE MARK]
VP - 1A Power Supply Check [CE MARK]
VP - 2 Keyboard Test
VP - 3.1 Platen Pre Check
VP - 3.2 Platen Wall Check
VP - 3.3 Platen Wall Adjustment
VP - 3.4 Rack Clearance Check
VP - 3.5 Rack Clearance Adjustment
VP - 3.6 X-Axis Solenoid to Guide Rod Check
VP - 3.7 X-Axis Solenoid to Guide Rod
Adjustment
VP - 3.8 Rack to Laser Shield Check
VP - 3.9 Rack to Laser Shield Adjustment
VP - 3.10 X-Axis Solenoids to Platen Channel
Check
VP - 3.11 X-Axis Solenoids to Platen Channel
Adjustment
VP - 3.12 Platen to Laser Shield Check
VP - 3.13 Platen to Laser Shield Adjustment
VP - 3.14 Pusher Arm to Platen Check
VP - 3.15 Pusher Arm to Platen Adjustment
VP - 3.16 X-Axis Solenoid to Rack Guide Check
VP - 3.17 X-Axis Solenoid to Rack Guide
Adjustment
VP - 4.1 Rack Sensor Check
VP - 4.2 Rack Sensor Adjustment
VP - 5.1 Tube Detect Sensor (Beam Block)
Check
VP - 5.2 Tube Detect Sensor (Beam Block) Ad-
justment
VP - 6.1 Mixin
Head Position Check
VP - 6.2 Mixin
Head Position Adjustment
VP - 6.3 Mixin
Home Sensor Check/Adjustment
VP - 6.4 Mixin
Contact Sensor Check/
Adjustment