28 Oct
1997 21:57
CELL-DYN
®
3/35 Sample Loader TS Guide 9140234B-June 1997
VERIFICATION PROCEDURES
VP - 3.14 Pusher Arm to Platen Check
3 - 51
3
Search
Book TOC
Go Back
VP - 3.14 Pusher Arm to Platen Check
Purpose:
Perform this procedure to verify the X-Axis Pusher Arms are ali
ned in the Platen Wall
Cutout, Fi
ure 3-23.
1. Put Sample Loader in Manual Mode.
a. Press and Hold
MAN
and
START
.
b. Turn Power
ON
, hold keys down until BEEPING stops.
2. Press
Y
key on Loader Keyboard until Pusher Arms are retracted.
3. Pusher head must be flush or, in the case of E and F Loaders, recessed approximately 1/2 of
platen wall thickness (Fi
ure 3-23).
4. Pusher head should be approximately centered in platen wall cutout (Fi
ure 3-23).
• If Check is OK,
o to “VP - 3.16 X-Axis Solenoid to Rack Guide Check” (Pa
e 3-55).
• If Check Fails,
o to “VP - 3.15 Pusher Arm to Platen Adjustment” (Pa
e 3-53).
Special Tools
DESCRIPTION QTY PN
None