28 Oct
1997 21:57
CELL-DYN
®
3/35 Sample Loader TS Guide 9140234B-June 1997
VERIFICATION PROCEDURES
VP - 3.8 Rack to Laser Shield Check
3 - 39
3
Search
Book TOC
Go Back
VP - 3.8 Rack to Laser Shield Check
Purpose:
Perform this procedure to ensure Platen is ali
ned (side to side) with the Tower.
1. Put Sample Loader in Manual Mode.
a. Press and Hold
MAN
and
START
.
b. Turn Power
ON
, hold keys down until BEEPING stops.
c. Ensure BAR (1/0) Switch is set to
1
2. Ensure Needle is in Home position.
3. Ensure Laser Shield hardware is ti
ht.
4. Press (
←
X
) key to move X-Axis Solenoids to Left Stop.
5. Insert Rack Guide Ali
nment Tool in Ri
ht Side of Platen.
6. Place Rack in Tool cutout (Under Tower) (Fi
ure 3-17).
7. Both Laser Shield Cutouts must line up exactly with tube positions 3 and 5.
8. Press
MAN
to ener
ize tube pusher solenoid.
9. Ensure tube pusher arm(s) do not hit rack.
Special Tools
DESCRIPTION QTY PN
Rack Guide
Ali
nment Tool
1 9420084