28 Oct
1997 21:57
CELL-DYN
®
3/35 Sample Loader TS Guide 9140234B-June 1997
VERIFICATION PROCEDURES
VP - 10.2 Tube Positioning Arm Alignment
3 - 135
3
Search
Book TOC
Go Back
VP - 10.2 Tube Positioning Arm Alignment
Purpose:
Perform this procedure to adjust Tube Positionin
Arm Len
th, Ener
ized and
Non-Ener
ized.
NOTE:E and F Loaders Only - G Loader does not have a Tube Positioning Arm.
1. Perform Check procedure “VP - 10.1 Tube Positionin
Arm Check” (Pa
e 3-133).
2. Remove Sample Loader Covers and Racks.
3. Disconnect tubin
between analyzer and Sample Loader. Do Not bend or kink sample tubin
.
4. Turn Sample Loader to access rear.
5. Ensure tube positionin
arm solenoid is strai
ht.
F Loader [Only OLD With Clamp] - (Others not Adjustable)
a. Loosen bracket and adjust as necessary (Fi
ure 3-73).
Special Tools
DESCRIPTION QTY PN
None